MIL-DTL-60318C (AR)
4. VERIFICATION
TABLE II. REQUIREMENTS/VERIFICATION CROSS REFERENCE MATRIX
METHOD OF VERIFICATION
CLASSES OF VERIFICATION
1-
Analysis
A - First Article
2-
Demonstration (end item test)
3-
Examination
B - Conformance
4-
Test
Section 3
Description
Verification
Verification
Section 4
Requirements
Method
Class
1
2
3
4
A
B
3.1
First Article
X
X
X
X
X
4.3
3.2
Materials
X
X
X
X
X
4.4.3.1
3.3
Ballistic assessment
X
X
X
4.4.3.2/4.5
requirements
3.4
Ballistic uniformity
X
X
X
4.4.3.2/4.5
requirements
3.5
Workmanship
X
X
X
4.4.2
4.1 Classification of verification. The verification requirements specified herein
are classified as follows:
a. First article inspection (see 4.3)
b. Conformance inspection (see 4.4)
4.2 Verification conditions. Unless otherwise specified, all verifications shall be
performed in accordance with the test conditions specified in Section 4 of this
specification.
4.3 First article.
4.3.1 Submission. Prior to initiation of sustained production, the contractor shall
submit a first article sample for evaluation in accordance with the provisions of 4.3. All
samples submitted shall have been produced by the contractor using the same production
processes, procedures, and equipment as will be used in fulfilling the contract. All
materials, except packaging, shall be obtained from the same sources as will be used in
regular production. The sample shall be accompanied by certificates of analysis (see 6.2).
A first article quantity, or portion thereof, as directed by the Contracting Officer, shall
also be submitted wherever there is a lapse in production for a period in excess of 90 days
or wherever a change occurs in the manufacturing process, material used, drawing,
specification or source of supply as to significantly affect product uniformity as
determined by the Government.
4.3.2 Inspection to be performed. The sample shall be subjected by the
Government to any or all of the examinations or tests specified in Section 4 of this
specification and any or all requirements as specified in the applicable drawings. Test
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business