MIL-DTL-757C
For multi-year contracts, the contractor should re-perform POP testing at a certified POP test
laboratory if:
a. The initial POP test report expires before the end of the contract (single pack POP
certification is valid for a period of 1 year; combination pack POP certification is valid
for a period of 2 years) or
b. There is a change in container manufacturer, design, or manufacturing processes of the
exterior shipping container.
No re-test is needed if all packaging is purchased while under an unexpired POP test.
EXCEPTION TO POP MARKINGS: If the container is manufactured outside the USA, the
contractor should not apply the UN POP certification mark provided in this contract (if
applicable). The contractor/container manufacturer (outside the USA) is responsible to perform
the UN POP certification tests and apply the marking authorized by the Transportation
Competent Authority of the country of manufacture. The contractor should also provide a copy
of the POP Test Report to the U.S. Army (ARDEC Packaging Div) for concurrence prior to
shipment.
6.11 Subject term (key word) listing.
Lead 2, 4, 6-tri nitro resorcinate.
Primer
Primary high explosive
6.12 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
Custodian:
Preparing activity:
Army AR
Army-AR
Navy OS
(Project 1376-2010-005)
Air Force 70
Review activities:
Army TE
Navy AS, NP
Air Force 11, 99
Civil agency:
GSA FAS
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency of
the information above using the ASSIST Online database at https://assist.daps.dla.mil
17
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business