MIL-DTL-46225D
4.3 First article. When specified, a sample shall be subjected to first article verification in
accordance with Table II. The testing shall apply to three (3) consecutive batches of lead azide
that have been produced by the contractor using the same production process, procedures, and
equipment as will be used in regular production. For a continuous process, samples shall not be
pulled until steady state has been reached. All material before steady state shall be discarded. All
materials, except packaging, shall be obtained from the same sources as will be used in regular
production.
4.3.1 First article quantity. The first article inspection shall be performed on the
quantities listed in Table II.
4.3.2 Inspection to be performed. The first article inspection shall be performed in
accordance with Table II.
4.3.3 First article rejection. If any item of the sample fails to comply with all first article
requirements, the first article shall be rejected.
TABLE II. First article tests and inspection.
No. of
Requirement
Paragraph Reference/
Examination or Test
Consecutive
Paragraph
Inspection Method
Batches
Crystal growth control agent
3
3.3
4.6.4
Physical characteristics
3
3.4
4.6.1
Chemical tests
3
3.5
4.6.2
Bulk density
3
3.6
4.6.3
Workmanship
3
3.7
4.6.5
5