MIL-DTL-248D
TABLE II. Granulation
Distribution
Percent by Weight, Min.
Types I & III
Type II
Through US Standard Sieve No. 14
95
100
Through US Standard Sieve No. 100
--
95
3.4.1 Flake/granule size for all Types. When screened in accordance with 4.4.11.1, TNT
flakes/granules shall be 100% passing through a sieve with an opening that is equal to or smaller
than a 3/8" square opening.
3.5 Workmanship. The material shall be processed in a manner that will produce the
high quality material necessary to meet the requirements of this specification. The material shall
be free of dirt, chips, and other foreign matter so that the safety and reliability of the explosive
product are not compromised.
3.6 100% process screening (applicable to Type III only). The reclaimed TNT material
shall be 100% inspected for ferrous and non- ferrous contaminants in accordance with 4.4.11.
4. VERIFICATION
4.1 Classification of Inspections. The inspection requirements specified herein are
classified as follows:
a.
First Article Inspection (see 4.2)
b.
Conformance Inspection (see 4.3)
4.1.1 Verification conditions. Unless otherwise specified, all verifications shall be
performed in accordance with the test conditions specified in section 4 of this specification.
4.2 First Article Inspection.
4.2.1 Submission.
4.2.1.1 For continuous process. Prior to initiation of sustained production and after the
process has been completely debugged, the contractor shall contact the Contracting Officer (see
6.2) for first article testing in accordance with the provisions of 4.3.3.1. The testing shall apply
only to TNT that has been produced by the contractor using the same production process,
procedures, and equipment that will be used in fulfilling the contract. All materials, except
packaging, shall be obtained from the same sources as will be used in regular production. The
first article tests shall be witnessed by the Government representative as designated by the
Contracting Officer. The first article testing shall also apply wherever a change occurs in the
manufacturing process, material used, drawing, specification or source of supply as to
significantly affect product uniformity as determined by the Government and whenever there is a
lapse in production for a period in excess of 90 days. Prior to submission, the contractor shall
inspect the sample to the degree necessary to assure that it conforms to the requirements of the
contract and submit a record of this inspection with the sample.
5